Our achievements

In the recent years the value of our completed projects in the areas of water-pipe networks and sewage systems was:

  • year 2003 - 8.500.000,00 PLN
  • year 2004 - 15.000.000,00 PLN
  • year 2005 - 11.800.000,00 PLN
  • year 2006 - 19.916.000,00 PLN
  • year 2007 - 23.500.000,00 PLN
  • year 2008 - 20.500.000,00 PLN
  • year 2009 - 19.800.000,00 PLN
  • year 2010 - 22.200.000,00 PLN
  • year 2011 - 35.600.000,00 PLN
The quoted values include:

Water-pipe networks:
  • construction of main line made of spheroidal pipes with diameter of 400mm, length 4500m  (Zlote Lany-Mikuszowice in Bielsko-Biala
  • construction of PE main line with diameter of 400mm, length 2200m (Kety)
  • replacement of spheroidal water-pipe network with diameter of 200mm, length 2500m,  (Szczyrk)
  • construction of PVC main line with diameter 315mm, length 2500m  (Jaworze)
  • replacements of water-pipe networks made of the above materials in the area of the city Bielsko-Biala with diameters of 40mm up to 300mm and total length of approximately 10 000m per year
  • repairs and connections to the city network of AQUA PLC
Sewage systems:
  • construction of concrete sewer-line with diameter of Dn 800mm, length 2100m (sewage system Wapienica – municipal water treatment plant)
  • construction of  PVC sewer-line with diameter of 600mm, length 1700m (sewage system for Lipnickie Housing Estate)
  • construction of  PVC sewer-line with diameter of 500/300mm, length 560m (sewage system for Bielska Dzianina)
  • construction of sewer-line made of iron pipes with diameter of 400mm, length 1100m (Jaworze)
  • construction of PE HD sewer-line with diameter of 800mm, length 700m (Zywiecka Street in Bielsko-Biala)
  • construction of sewage systems using those materials with diameters of 200mm within the area of the city Bielsko-Biala with the total length of approximately 4000m a year
  • repairs and connections to the municipal system of AQUA PLC